2 Min.
Under the Project, 13 underground; 2, including ground-based stations are a total of 15.
  • Mecidiyeköy Station
  • Çağlayan Station
  • Kağıthane Station
  • Nurtepe Station
  • Alibeyköy Station
  • Yeşilpınar Station
  • Veysel Karani Station
  • Akşemsettin Station
  • Kazım Karabekir Station
  • Yeni Mahalle Station
  • Karadeniz Mahallesi Station
  • Tekstilkent Station
  • Yüzyıl Station
  • Göztepe Mahallesi Station
  • Mahmutbey Station
Hattın Diğer hatlarla entegrasyonun ardından ulaşım süreleri;
  • Mahmutbey – Mecidiyeköy 26 mins
  • Mahmutbey – Sarıyer Hacıosman 45 mins
  • Mahmutbey – Yenikapı 39,5 mins
  • Mahmutbey – Üsküdar 48,5 mins
  • Mahmutbey – Kadıköy 52 mins
  • Mahmutbey – S. Gökçen Havalimanı 95,5 mins
  • Mahmutbey – S. Gökçen Havalimanı 95,5 mins
  • Çağlayan – Gaziosmanpaşa 13 mins
  • Mecidiyeköy – Alibeyköy 7,5 mins
Double tube tunnel with the lenght of 18 km approx. 3 viaducts at total, including a viaduct (1 km approx.) connecting warehouse zone Totally 15 stations in the type of viaduct, tunnel, cut and cover

Depot Area and Maintenance Facility. Capacity of transporting 70.000 passengers per hour in one direction. The route passing through 6 districts (Şişli-Kağıthane-Eyüp-Gaziosmanpaşa-Esenler-Bağcılar)
Web Tasarım | BosphorusMedia